Electrical work of TVS (Tunnel Ventilation System) and ECS (Environment Control System) for DMRC (Delhi Metro Rail Corporation)
-
-
Erection of switchyard in a remote and hilly terrain.
-
-
Up gradation of switchyard with addition and synchronization of bay to the existing system.
-
-
A T-off connection in a switchyard.
-
-
5MVA transformer with LA and its counters.
-
-
CT, PT, LA, VCB ready to receive supply.
-
-
A close view of installation and connection in a switchyard.
-
-
RTCC Panel integrated into an old system
-
-
VCB and CT side by side on same structure.
-
-
Relay Panel coupled with existing system for central control.
-
-
Conductor termination on transformer bushing.
-
-
Three Panel HT Switchboard installed in a commercial establishment.
-
-
Main Power Control Centre of a Switchyard.
-
-
A dry type transformer installation with LT bus duct.
-
-
Main Power Control Centre with four emergency incomers and two mains incomers, all connected by bus ducts.
-
-
An installation with BMS controlled exhaust system.
-
-
Installation of fully automatic Motor Control Centre.
-
-
Multi tier cabling system.
-
-
Bus duct termination on four 1010KVA Generators.
-
-
Four emergency bus duct installations exiting sound proof room.
-
-
A close view of an exhaust system installation.
-
-
Interior work – Programmable logic switch control for a five star hotel.
-
-
Interior lighting system – Entrance to a five star suite.
-
-
Clean room electrical work for Pharmaceutical and related industries.
-
-
Electrical work for Pharmaceutical laboratories.
-
-
Electrical installation for Garment industry with lighting and power on bus trunking.
-
-
Another view of the Garment industry installation.
-
-
A LT Room installation
-
-
300mtr. long, 12mtr. high factory shed LED lighting installation
-
-
IP65 lighting installation on a false ceiling
-
-
Another IP65 lighting installation
-
-
Two nos. PCC with seven nos. sandwich busduct installation
-
-
Another view of two nos. PCC with seven nos. sandwich busduct installation
-
-
Forced air cooled transformer installation
-
-
Outdoor cable termination on a motor
-
-
1500KVA (3X500KVA) UPS installation with dry type battery bank
-
-
3200A, 250mtr. long sandwich bus trunking installation
-
-
Tap off box on a sandwich bus trunking
-
-
Expansion joint installation on a sandwich bus trunking.
-
-
125KW Solar installation
-
-
2000KVA and 1250KVA DG installation
-
-
35mtr. Chimney erection
-
-
Closer view of chimney erection